Air pressure and buildings
Air tightness refers to the continuity of a buildings fabric and its ability to retain air (and heat), it is measured in terms of an air leakage rate through the building's envelope. Air pressure might be described as the force exerted by air on any surface in contact, in a unconfined, confined or compressed space. Air tightness is measured with reference to a certain air pressure, normally given as 50 pascals, in a building this is approximately the pressure exerted on a fabric if a 20 mile an hour wind is blowing on all of its side sides at the same time.
at a given reference pressure (usually 50 pascal) divided by the: Heated building volume V. At 50·Pa, it is called the air change rate at 50 Pa and usually noted n50(units: h−1).
, air pressure and air flow in buildings are all related but also. .. of air or any other fluid is caused by a pressure differential between two points.
Flow will originate from an area of high energy, or pressure, and proceed to area(s) of lower energy or pressure.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.